Regarding DURASKIRT™ Installation.
Q: How much time does DURASKIRT™ take to install?
Answer:
We have people asking us this question all the time. The simple answer is to calculate the time to install one panel at a time then multiply it by the number of panels needed for your home. Once you know this you can simply do the math. The average home takes approximately 60 panels. So let’s assume 5 minutes each multiply by 60 panels then divide by 60 minutes per hour = 5 hours.
Now do not be frustrated if it takes you more time. We have people that can install a home in less than three hours which is flat out moving. Don’t be shamed because most homeowners average twice this rate and it can take even longer if the site is not prepped properly.
Remember the five Ps?
Proper Preparation Prevents Piss Poor Performance. If you have never heard of the five P’s well, it’s about time you learned and take it to heart. I want to continue by emphasizing the following before we go into preparation because I feel it very important to get this concept down first, that is, install times.
Again, How long does DURASKIRT™ installation take?
Really it depends on your home. Usually, it can take 3 – 8 hours to remove existing skirting from your home. Then you need to inspect and see if you have and rot where you need to attach the new …skirting and if so you must replace these areas with new wood. When this is all finished, DURASKIRT™ installation can take between 3 to 7 minutes per panel to install depending on your skill level and the home site. So one person can install DURASKIRT™ in one 9 hour day or up to 3 seven-hour days. Two people can install DURASKIRT™ in 4 1/2 hours or up to 10 1/2 hours.





1″ to a 1 1/2″ gap from the top of the skirting panel to give good ventilation.
Looking for more detailed information? DURASKIRT™ installation videos.
Helpful Hint: Another use for your shovel.
Mark your shovel handle at 31″.
Grade the site first by measuring and placing a 31″ mark on your shovel handle or a stick. A shovel handle works best because it is already in your hand. A properly prepared site is graded so that the skirting panels have a 31″ gap to the ground from the rim-joist. When the panels go in they need at least a 1″ gap but can go as much as 1 -1/2″ gap. This photo helps explain: